- At the desired location, drill two .52 (13.10 mm) dia. holes in tank wall corresponding to mounting centers of gage. FIG. A.
- Remove burrs from holes to provide good sealing surfaces. FIG. A.
- Install gage to tank - Make sure O-rings are set properly in recess provided, either in gage body or in sealing spacer sleeve, (outside of tank wall between gage and tank.)
- Tighten mounting nut with a socket wrench. Torque mounting nut to 60 inch lbs (6.78N•m). It is not necessary to over compress seals to make a liquid tight seal. FIG. B.
- Gages 3.00 through 12.00 (76.20mm through 304.80mm) centers inclusive have tank seals recessed in gage body-Gages 13.00 through 20.00 (330.20mm through 508.00mm) centers inclusive are furnished with sealing spacer sleeves.* FIG. B.
FIG. A

|
FIG.B

|
|
|
 |
LDI Industries, Inc.
1864 NAGLE AVE., P.O. BOX 1810
MANITOWOC, WI 54221
PHONE: (920) 682-6877
FAX: (920) 684-7210
|
Copyright © Lube Devices, Inc. All Rights Reserved. Privacy Statement
|
 |
|